We use cookies. Find out more about it here. By continuing to browse this site you are agreeing to our use of cookies.
#alert
Back to search results

Lead Project Scheduler Project Controls

ECM
parental leave, paid time off
United States, Idaho, Blackfoot
Mar 02, 2026

About DZMC

No problem is too challenging or complex for Day & Zimmermann Maintenance and Construction (DZMC) because We do what we say! We're here to make life easier for plant owners in the Power, Chemical, and Industrial markets. With our wide-ranging capabilities and long-standing industry experience, we deliver innovative solutions and seamless processes that effectively manage all aspects of the plant life cycle. It's no wonder we're the #1 maintenance services provider in the United States. Come join in on our purpose - We put people to work, we protect American freedoms, and we help our customer's power and improve the world! https://www.dayzim.com/services-and-products/maintenance-construction

We're looking for a Lead Project Scheduler to join our EPC Project in the nuclear power plant environment in Blackfoot, Idaho

Our lead scheduler is responsible for performing all aspects of scheduling. Capable of creating and maintaining an EPC schedule with minimal supervision and, in turn, may provide some technical guidance to less experienced scheduling personnel.

As the Lead Scheduler here's the work you'll do:



  • Develop and/or modify project schedule and or the integration of multiple project schedules into an overall Master Project Schedule
  • Work with Engineering, Construction, and Operational teams to develop detailed schedules and Responsible for keeping these schedules current.
  • Schedule development to allow for earned value, productivity measurement and tracking based on construction work area and functional discipline.
  • Analyzing and auditing schedules.
  • Manage key quantity tracking for progress measurement.
  • Lead all schedule discussions and formal schedule meetings.
  • Provide reports and report out at executive level review meetings on project status.


This role is for you if you have these skills:



  • Excellent interpersonal and communication skills (both written and oral)
  • Must possess critical thinking skills and ability to independently solve problems.
  • Strong organizational skills and ability to focus on goals to attain defined end results
  • Thorough understanding of Primavera (P6) scheduling software
  • Basic knowledge/understanding of industry scheduling terminology


And if you have these qualifications:



  • EPC Scheduling Experience
  • New Construction Experience
  • Nuclear Power Scheduling
  • Some college or post secondary education preferred or minimum of five years related experience in a construction environment.
  • Six plus years experience in related scheduling assignments
  • Computer proficiency certifications a plus or equivalent education
  • Experience working under an ASME NQA-1 Quality Assurance Program preferred



In compliance with this state's pay transparency laws, the salary range for this role is $91,000 - $206,000. This is not a guarantee of compensation or salary, as final offer amount may vary based on factors including but not limited to experience and geographic location. (The specific programs and options available to an employee may vary depending on date of hire, schedule type, and the applicability of union fringes).

We care about our employees and it shows. Our staff receive a competitive salary and a comprehensive benefits package which includes medical/Rx, dental and vision coverage; life, AD&D and disability insurance; flexible spending accounts; 100% paid maternity leave for up to 12 weeks, parental leave, family leave, other paid time off; voluntary benefits and discount programs to meet our employees' individual needs including pet insurance for our furry family members!

To ensure a safe work environment while meeting the physical demands of the job, you must be able to perform the following physical and mental tasks, with or without a reasonable accommodation:

  • Visual acuity (e.g., needed to prepare and analyze data, to transcribe documents, to view a computer, to read, to inspect objects, to operate machinery.
  • Balancing (e.g. maintaining equilibrium when walking, climbing, crouching, etc.)
  • Stooping (e.g. bending the spine at the waist)
  • Reaching (e.g. reaching the arms or legs in any direction)
  • Lifting motion or lifting objects more than 15 pounds
  • Walking
  • Repetitive motion of any part of the body
  • Kneeling, crouching or crawling
  • Manual Dexterity (e.g. picking, pinching, typing, or other working that uses fingers)
  • Grasping (e.g. use of hand to apply pressure)
  • Climbing (e.g. ascending/descending ladders, stairs, scaffolding, ramps, pole, etc. using feet and legs and hands/arms to climb)
  • Hearing
  • Talking
  • Capacity to think, concentrate and focus for long periods of time.
  • Ability to read complex documents in the English language.
  • Capacity to reason and make sound decisions.
  • Ability to write complex documents in the English language.
  • Capacity to express thoughts orally.
  • Expertise in:
  • Ability to wear a mask, respirator, bullet proof vest, or other equipment.
  • Ability to regularly perform all job functions at Company's office or worksite.
  • Ability to withstand environmental conditions (e.g. extreme heat or cold, grass, wind, sand, fumes, odors, gases, extreme noise, etc.)


SO WHAT ARE YOU WAITING FOR? APPLY NOW!
Applied = 0

(web-bd9584865-7clgh)